|
|
|
|
LEADER |
00000cam a22000004a 4500 |
001 |
UP-99796217602532787 |
003 |
Buklod |
005 |
20230503092542.0 |
006 |
m |o d | |
007 |
ta |
008 |
080209s1990 xx r |000 u|eng d |
035 |
|
|
|a (iLib)UPD-00000136708
|
041 |
|
|
|a eng
|
042 |
|
|
|a DMLUC
|
090 |
|
|
|a TS 176
|b W35 1990
|
100 |
1 |
|
|a Wallace, Thomas F.
|
245 |
1 |
0 |
|a MRP II
|b making it happen
|c Thomas F. Wallace.
|
250 |
|
|
|a 2nd ed.
|
264 |
|
1 |
|a Essex Junction, Vt.
|b Oliver Wight
|c c1990.
|
300 |
|
|
|a 322 p.
|
650 |
|
0 |
|a Production planning.
|
650 |
|
0 |
|a Manufacturing resource planning.
|
842 |
|
|
|a Book
|
905 |
|
|
|a FO
|
950 |
|
|
|a Paper
|
852 |
1 |
|
|a UPD
|b DBUS
|h TS 176 W35 1990
|
942 |
|
|
|a Book
|